Context
The objective of power system planning is to meet energy demand reliably and at minimum cost. Future electricity demand should be determined by incorporating demand-side management measures, such as peak-clipping, valley-filling and load-shifting, as well as efficient end-use. It is recommended that life-cycle-cost investment planning be developed and implemented to give equitable treatment to rehabilitation, loss-reduction and end-use efficiency.
Broader
Facilitated by
Value
SDG
Metadata
Database
Global strategies
Type
(D) Detailed strategies
Subject
- Resources » Energy
- Conservation » Conservation
Content quality
Yet to rate
Language
English
1A4N
J4958
DOCID
12049580
D7NID
197980
Editing link
Official link
Last update
Dec 3, 2024


